Multiple stages of a modular build.

First module is to have a quick shelter built soundly to sustainability through the harshness of a Wisconsin winter. Module 1 from start to finish is expected to take no more than 6 month. However, fill out may continue through the winter months once initial geodesic shells are completed.

Key Points of the build.

  • Only the smallest survivable square footage Units. (two part first module: Part 1 is for sleeping and life sustaining & Part 2 is aux functions cooking, storage. electricity, sanitation. Part 1 is fully separate of the more risky Part 2 and will be the most survivable of the two and will be the first build.)

  • High Strength Ultra Lite and inexpensive off the shelf materials.

  • High R value insulation.

  • High Self-Sustainability of module.

  • 100% off the grid of all resident modules.

  • Only Proven off-grid technology for electricity based on the unique natural energy provision of the area. (Wood & Wind) (Simple Wood-Gas & VAWT power generators)